There are no proposals to increase the number of loops or...
There are no proposals to increase the number of loops or running lines. The biggest threat to freight is the loss of existing and future 60mph freight slots on the ECML.
There are no proposals to increase the number of loops or running lines. The biggest threat to freight is the loss of existing and future 60mph freight slots on the ECML.