I don't think we ever had a point where we didn't believe that the ballpark was going to be ready on Opening Day. The productivity of the workforce was at an incredibly high level, and we were blessed with great weather. We've been running ahead of schedule for quite some time.
As far as the portions of the ballpark that are complete, that is complete at a very, very high level. Generally, the parts of the ballpark that still have work to do are those areas where we either do not have seating available or we only have a portion.